Neurologic & Orthopedic Hospital
Chicago, IL

In 2009 the NOHC closed its doors and the doctors merged with NorthShore University HealthSystem. Synergy Construction Group has continued this successful NOHC relationship with NorthShore University HealthSystem in meeting their on-going construction needs.
PROJECT IN BRIEFNumerous Design Build Solutions
Illinois Department of Public
Health Corrections
Illinois Department of Public
Health Corrections
PROJECT DURATIONMultiple Fast Track Phases
BUDGET$5,000 – $2 MM
SIZEMultiple floors throughout the entire hospital
TEAMKutlesa Hernanadez Architects
Architect
Jensen & Halstead
Architect
Rush Mechanical
Mechanical Design
Phillips Electrical
Electrical Design
